Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the amp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_has_paired_endpoint was called incorrectly. Function cannot be called before services are registered. The service ID "paired_routing" is not recognized and cannot be retrieved. Please see Debugging in WordPress for more information. (This message was added in version 2.1.1.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. The function was called too early (before the plugins_loaded action) to determine the plugin source. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_has_paired_endpoint was called incorrectly. Function cannot be called before services are registered. The service ID "paired_routing" is not recognized and cannot be retrieved. Please see Debugging in WordPress for more information. (This message was added in version 2.1.1.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. The function was called too early (before the plugins_loaded action) to determine the plugin source. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is currently doing the `plugins_loaded` hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. It appears the plugin with slug `google-analytics-for-wordpress` is responsible; please contact the author. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is currently doing the `plugins_loaded` hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. It appears the plugin with slug `google-analytics-for-wordpress` is responsible; please contact the author. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gotmls domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/independ/public_html/wp-includes/functions.php on line 6170
Kerajaan Perlu Kaji Sebelum Benarkan Industri Perkayuan Beroperasi Semasa PKP – Independent

Kerajaan Perlu Kaji Sebelum Benarkan Industri Perkayuan Beroperasi Semasa PKP

Reading Time: < 1 minute

Kerajaan Persekutuan melalui Majlis Keselamatan Negara (MKN) dan Kementerian Perdagangan Antarabangsa dan Industri (MITI) perlu memperhalusi kebenaran yang telah diberikan kepada sektor industri berasaskan kayu-kayan untuk beroperasi dalam tempoh Perintah Kawalan Pergerakan (PKP).

Gesaan ini adalah merujuk kepada kenyataan Menteri Besar Perak, YAB Dato’ Seri Ahmad Faizal Azumu yang berharap sektor berasaskan kayu-kayan dibenarkan beroperasi kerana sektor tersebut menyumbang kepada salah satu hasil utama negeri dan beroperasi jauh dari tumpuan umum.

Produk daripada industri berasaskan kayu-kayan bukannya merupakan sebahagian daripada rantaian bekalan penting malah ia bukannya dikategori sebagai sektor perkhidmatan perlu dan melibatkan kepentingan awam.

Persoalannya, adakah justifikasi dan alasan bahawa sektor tersebut menyumbang kepada salah satu hasil utama negeri dan beroperasi jauh dari tumpuan umum boleh diterima.

Adakah pihak-pihak berkuasa dan pemain-pemain industri di sektor tersebut juga boleh memberi jaminan bahawa syarikat-syarikat yang beroperasi mampu mematuhi protokol kesihatan dan keselamatan yang ditetapkan.

Industri berasaskan kayu-kayan di negara kita kebanyakannya masih mengamalkan kaedah konvensional, menggunakan tenaga kerja yang ramai dan keadaan persekitaran yang rencam.

Adalah dibimbangi, kebenaran yang diberi kepada sektor industri berasaskan kayu-kayan untuk beroperasi boleh mengganggu usaha kerajaan menyekat dan mengawal penularan pendemik Covid-19.

Meor Razak bin Meor Abdul Rahman adalah pegawai lapangan dan aktivis Sahabat Alam Malaysia (SAM)